Previous posts regarding this subject: run engine and bring up to temp once a month or so. Run everything, a/c's , otr, transmission, air level system, fans, water system, generator under 50% or more load.
All this takes is about one hour to do.
Remember, the more you use your bus , the better condition it will be in.