-
I just completed the install on my Air Force One system. Installing the TOAD components on my RAM was very straightforward, but did take up more time than I originally assumed. For a neat and secure install, you need to take your time and plan out your runs for wiring and tubing. The toughest part was getting the bus in the air and choosing the correct air lines to tap into. A friend, who is a heavy truck mechanic, helped me a ton. We put the drive wheels on his ramps, aired up the suspension and secured the chassis with jack stands. Without him, I would just not have had the confidence to cut into the air lines. We were able to find a nice compact location in the passenger side compartment above the drive and tag wheels to mount everything.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules