Thanks for all the tips...

In going through some of the documentation that came with the bus, I noticed on the Prevost build sheet that it was equipped with "level lo", so I'm assuming that when I auto-level the bus, it will do so at the lowest level possible.

That's great for that first step up into the bus, but a problem with the clearance needed for the sewer connection.

So, it looks like manual leveling is the answer to strike that balance between entry step height and adequate clearance for the sewer connection.

Of course, there's always that macerator connection.... hmmm....