Hydronic manifold installed
Making progress on my DIY Hydronics system and I have the zone manifold and distribution piping almost finished.
As you can see from the attached picture that it looks fairly complicated. But it is really not a lot of work. I really, really love the ProPEX expansion tool type of system as it makes doing this kind of work dirt simple.

As you can see I had to fit it into a fairly tight area based on all the previous stuff/hacks that have been done on my bus.
I would like to say that I planned it out with every detail accounted for, but hey the flexibility of this type of PEX A/ProPEX system really works. I made the basic layout based on the minimum recommended pipe segment length which is three inches for 3/4 PEX and two inches for 1/2 PEX.
Also by varying the assembly steps it is easy to work in tight quarters as you have about 20 seconds after expansion to jam the pieces together and allow them to shrink back to a tight fit.
I would say this represents about two full days of actual work to have multiple zone heat distribution for the bus living quarters/bays and it will take another 2-3 days (not counting skull sweat time) to finish the plumbing portion of the system.
Last edited by freds; 03-31-2020 at 12:47 PM.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules