You mentioned sloping the floor 4.5" over the first 42'. Also consider loosing that 4.5" in a much shorter span. Say at a point from the 40ft. mark to the 42ft. mark. Just ramp down in a shorter span so as to have the floor level over most of the barn. I like a level floor to work on, others may not care.