Results 1 to 2 of 2

Thread: Battery Replacement Procedu

  1. #1
    Join Date
    May 2018
    Location
    Edmond
    Posts
    280

    Default Battery Replacement Procedu

    Hello,

    I will be replacing my house batteries this weekend. 1998 Featherlight Vantare. Two Trace 4024 inverters. 8 4D batteries. I just want to confirm the following the correct shut down / startup procedure. Please advise

    Step One (inside coach inverter / breaker panel.
    1) Turn inverters off
    2) Turn DC Main off
    3) Turn off all AC breakers

    Step Two (outside inverter bay Vantare Panel)
    1) Pull Distribution Panel Button to OFF
    2) Leave on Alternator Disconnect Switch
    3) Turn off 24 Volt feeder breakers to Inverter 1 and 2
    4) Turn off inverter output breakers

    Step 3 (Water Bay)
    1) Turn off shore power breaker

    Do I need to shut of the coach 24 and 12 volt mains?

    I plan on marking all battery cables as I take them out.

    Any advice will be much appreciated.

    Thanks

  2. #2
    Join Date
    Dec 2012
    Location
    La Quinta
    Posts
    250

    Default

    Did you get show pricing from Truk for Lifelines?

    Later
    bv


    Bernie & Deborah
    2019 Marathon X3 #1291
    2019 Intech Stacker

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •