I'm about to re-install the 10 ft awning after having the sewing done and I can't recall the formula for loading the spring.
I think it is 6 more turns than the length of the awning. Therefore, I would wind the 10 footer 16 turns. Am I correct?
I'm trying to recall the formula I used on the big 20 ft and I think it was 26 turns.
Tried to call Zip Dee and they are closed until the first of the year.
I need the awning before that because it is so warm and sunny down here.